OTIF

Intergovernmental Organisation for International Carriage by Rail

Accident and Incident Reports

According to Article 16 § 4 of the ATMF UR “ The Contracting States shall keep records, publish investigation reports including their findings and recommendations, inform the authorities concerned and the Organisation of the causes of accidents, incidents and severe damage in international traffic that occurred on their territory. ”
The 14th session of the Committee of Technical Experts (CTE) (Bern, 14-15 June 2022) requested the Secretary General to make the information that is notified to him in this context accessible through OTIF’s website.

Title Date Submitted by Link Language
JNS report on “Accident Gotthard base tunnel - broken wheels"
Oct. 2026
ERA

Part 1: Final report version 5.1

Note 1: the JNS risk control measures of the report version 5.1 of 19 October 2026 replace entirely the Agreed long term mitigation measures of 28 November 2019 from the JNS Normal Procedure “Broken Wheels” for wheels of wheel type BA 004 (“crack in the rim”) and the JNS risk control measures from the final report version 5.0, published on 10 August 2026 and all other previous versions.

 

The measures for “crack in the web” (wheel types BA 314 old/ZDB29) from the Agreed long term mitigation measures of 28 November 2019 from the JNS Normal Procedure “Broken Wheels” remain valid.

 

Version 5.1 is the currently applicable version of the report and contains editorial corrections to version 5.0. The following document identifies the differences between these two versions: Comparison document.

 

Part 2: Full Impact Assessment

 

Part 3: JNS Working Instruction Visual Inspection ECM

 

Part 4: JNS Wheel Analyses

 

Part 5: JNS list of assessed wheel types
Note 2: This list contains the wheel types that were already assessed to determine if they are comparable to wheel type BA 004  (the most recent version of list is dated 19.10.2026).

EN
JNS report on “Consequences of unintended brake applications with LL blocks”
Mar. 2024
ERA
EN
JNS report on “Extreme effects of thermal overload in special cases of freight operation”
Feb. 2022
ERA

Part 1: Principles and organisation

Part 2: Action plan containing short-term risk control measure

Note:  the risk control measures identified during the Urgent Procedure have been entirely replaced by risk control measures identified in the Normal Procedure “Consequences of unintended brake applications with LL blocks”.

Part 3: Detailed information on the work of the JNS task force

EN
JNS report on “Great Belt bridge accident/incident”
Apr. 2022
ERA
EN
JNS report on “Wagon Braking Systems”
Dec. 2019
ERA
EN
JNS report on “Broken Wheels”
Nov. 2019
ERA
EN

Search

If you don’t find what you are looking for try with a different term or Contact Us